Project at a glance

Roof Area: 1,750m²

Building Use: School

Location: Coventry

Roof Type: Refurbishment

Approved Contractor: Complete Roofing

 

The project

The roof area was split over different buildings to Woodlands Academy, Coventry. Each roof had a box gutter detail incorporated around the perimeter.

The existing felt surface was left in place to act as a Vapour Control Layer (VCL) and insulation was bonded to the surface with cold applied high foaming polyurethane adhesive.

The membrane was fully bonded to the glass tissue faced insulation board with RubberBond PU adhesives. The approved RubberBond contractor wanted a system that would allow the installation to be installed within the given time period of the school holidays.